by [email protected] | Jan 19, 2023
Monitoring multiple tunnel boring machine data points during the excavation of over 10,000 feet of large-diameter tunnel. Problem SAK Construction, LLC, a national tunnel excavation and pipe rehabilitation contractor based in St. Louis, MO, was awarded a contract to...
by [email protected] | Jan 19, 2023
Vista Data Vision Automated Report Generation, Saving Significant Annual Costs Connecting Rail to a Mountaintop University The Quebec government is building Réseau Electrique Métropolitain (REM), a 67-kilometer light-rail train system that will provide the...
by [email protected] | Jan 17, 2023
San Francisco’s Salesforce Tower constructed quickly and safely with optimized automated survey system. Problem In 2013, construction began on the Salesforce Tower which at completion stands 1,070 feet in height – the tallest in the San Francisco skyline. The building...
by [email protected] | Jan 17, 2023
New monitoring platform supports the Yeager Airport Runway Reconstruction and provides ongoing condition monitoring after a landslide. Problem In 2015, one of the tallest engineered slopes in the United States experienced a landslide at the end of Runway 5 at...
by [email protected] | Jan 17, 2023
An automated ground displacement monitoring solution shows savings of over 60% Problem The new skyscraper, exceeding 1,000 feet in height, will soon mark Toronto’s skyline as the tallest high-rise building in Canada. Whenever a structure of this height is built,...